SENTAR SeaPort-e Contract Information

Team Members
  • Sentar
    http://www.sentar.com/
  • Barling Bay
    http://www.barlingbay.com
  • TMGe
    http://www.tmgellc.com
  • We want to hear from you! If you have any input or comments about our services performed, you can email them to this address:  This email address is being protected from spambots. You need JavaScript enabled to view it.
Functional Services

Functional Areas for the Sentar SeaPort-e Team:

  • Research and Development Support

  • Engineering, System Engineering and Process Engineering Support

  • Modeling, Simulation, Stimulation, and Analysis Support

  • Prototyping, Pre-Production, Model-Making, and Fabrication Support

  • System Design Documentation and Technical Data Support

  • Software Engineering, Development, Programming, and Network Support

  • Reliability, Maintainability, and Availability (RM&A) Support

  • Human Factors, Performance, and Usability Engineering Support

  • System Safety Engineering Support

  • Configuration Management (CM) Support

  • Quality Assurance (QA) Support

  • Information System (IS) Development, Information Assurance (IA), and Information Technology (IT) Support

  • Inactivation and Disposal Support

  • Interoperability, Test and Evaluation, Trials Support

  • Measurement Facilities, Range, and Instrumentation Support

  • Logistics Support

  • Supply and Provisioning Support

  • Training Support

  • In-Service Engineering, Fleet Introduction, Installation and Checkout Support

  • Program Support

  • Functional and Administrative Support

  • Public Affairs and Multimedia Support

Functional Areas for TMGe (Excel format)

Functional Areas for Barling Bay (Excel format)

Zone Coverage
  • Zone 1 Northeast

  • Zone 2 National Capital Zone

  • Zone 3 Mid Atlantic

  • Zone 4 Gulf Coast

  • Zone 5 Midwest

  • Zone 6 Southwest

  • Zone 7 Northwest

Points of Contact
Quality Assurance

See .pdf document:

Task Order History

N65236-18-F3071 Mod 001.pdf